Well thanks to my 2014 trip I got a chance to set right what once went wrong and thanks to the trick of using the "flash" white balance setting I was able to show the California landscape for the parched, brown hellhole it is. This set of photos runs from Milepost 113 on the UP Roseville Sub all the way until just before Reno. It is a testament to the clockwork nature of the dining car that I managed to get back to my post at the rear of the train just on mile before where I managed to do so in 2012. You can find the full set of the take 2 photos right here.
Between Roseville and Colfax the route operates as a split main line as the original alighment was improved upon to eliminate curves and grades, but not entirely replaced. That is why many of the initial photos will show just a single track. Here we are on track two with everything all dead and lifeless from the California drought, but adjacent to the track is a small aqueduct brining water down to a farm or residential community. Can someone say "unsustainable"?
Emerging from the short two-track tunnel at Newcastle.
One of the many times this line will cross over or under Interstate 80 just west of Auburn, CA, which has a station for a single Capitol Corridor round trip.
Crossing over to track #1 at BOWMAN means I get to take pictures on a whole new track segment thanks to the split main configuration. Here the main tracks cross over each other and I got to take a picture from an alternate point of view with some local kids to add some flavor.
While a crossover is provided for Amtrak trains eastbound on track #1 to platform on track #2 at Colfax, a Union Pacific Autorack train was in the way with ES44AC #5284 on point.
This forced our train to platform using the grade crossing and then run against the current of traffic on the 30 mile section of single direction ABS track between Colfax and SWITCH 9. Just one of several small delays that set out train back about 45 minutes en-route to Reno.
Unfortunately UP is in the process of ripping out the aforementioned classic ABS signaling with the western end of the section having the new masts already up and cut in for ABS operation.
Crossing I80 on a different viaduct I was afforded a good view of the older Track #2 bridge.
Pretty S-curve as we climb higher into the Sierra Nevadas.
View along the American River gouge.
Running reverse means getting to see the approach lit searchlight ABS signals all lit up. All the running on track #1 made this second trip almost like running on a different route.
the track off to the right is a baloon track to turn helpers on westbound trains running that have just helped . Helpers cut off on the fly then run around on the loop track before crossing over via the hand throw switch that is provided.
























































